First stone laying of the Fire Station in Straubenhardt

On September 13, the first stone laying of the new fire station in Straubenhardt took place. The sustainable building is being planned and built in the spirit of »cradle to cradle«.

Historical Oberamteistrasse — what's going on behind the fence?

Answers to the question about what is going on behind the fence and the walls of the historic row of half-timbered houses are now provided by »peepholes«: Along with the head of the building department of the city of Reutlingen, Ulrike Hotz, Stephan Burger (wulf architekten) and Elke Nagel (strebewerk architekten) introduced the presentation on the construction fence.

Office and Commercial Building at Stiftstraße 3 — opening of Hermès store in Stuttgart

Our new office and commercial building at Stiftstraße 3 completes the appearance of Stuttgart's inner city between the shopping street Königstraße, the listed Stiftskirche and the market square. With its facade made of shell limestone, the new building subtly complements the surrounding ensemble from the 1950ies – in a contemporary way. Currently, the office spaces in the 2nd and 3rd floor are being equipped. The French label Hermès now opened its store on the ground floor.

Presentation by Tobias Wulf at the Architekten- und Planertag 2019 — Facade of the Parking Garage P22a

This year's Architekten- und Planertag (architects' and planners' day), organized by AiT-Dialog, is titled (RE)CONNECTING – URBANE RÄUME NEU VERNETZT. In addition to the symposium, the exhibition »Best Practice im Dialog – Entwurf und Detail« stages six innovative projects. Here, Tobias Wulf gives insights into our »Parking Garage Facade P22a« at the Cologne Exhibition Centre.

Location: ACO Academy Büdelsdorf, Am Friedrichsbrunnen, 24782 Büdelsdorf
Date: 12 September 2019
Time: 10:00 – 17:00 o'clock

More information
Programme

»National Open Monument Day« — Historical Oberamteistrasse in Reutlingen

On the occasion of this year's national Open Monument Day (Tag des offenen Denkmals) on September 08, we gave insights not only into the current status of our project but also into the architectural research taking place at the medieval row of half-timbered houses at Oberamteistrasse, Reutlingen.

The whole project comprises the structural stabilization and renovatation in conformity with monument preservation requirements as well as a new, translucent building which stabilizes the historical row of houses. Inside, the new structure will exhibit 800 years of architectural and cultural history.

Groundbreaking ceremony for HPC Helmholtz Pioneer Campus

On September 05, the groundbreaking ceremony of the new Helmholtz Pioneer Campus in Munich took place. The cut of the spade was celebrated in presence of Bavaria's prime minister Markus Söder. The HPC building is intended to fit in and yet, with its rhombus-shape, set an accent for the newly emerging »Gaborplatz«.

Our competition entry for the development of a primary school with after-school care, a day care center, and a sports hall for the currently emerging Potsdam district of Krampnitz has been distinguished with a 2nd prize.

Historical Oberamteistraße in Reutlingen — workshop report

At the workshop report on August 20, Elke Nagel (strebewerk.) and Ingmar Menzer presented our project located at Oberamteistraße in Reutlingen.
The medieval row of half-timbered houses will be structurally stabilized, renovated and converted in conformity with monument preservation requirements. The whole project also comprises a new, translucent building which stabilizes the historical row of houses. As a walk-in exhibit of the local history museum, the whole ensemble makes 800 years of both architectural and cultural history visible.


Read more
TV report on RTF.1

On Wednesday, 14 08 2019, the first stone laying of the new canteen of the north vocational training center in Darmstadt and of its the rebuilding and restructuring of the training center took place.
The new canteen building, which also hosts the library and media center, in the direct vicinity of the Berufsschulzentrum Nord is designed as a two-storey solitaire. Due to its jagged facade, it has a characteristic appearance.

additional informations

Cradle-to-Cradle: Fire Station in Straubenhardt on air on SWR2

Talking about circular economy in its radio program on 27 July, the radio channel SWR2 discussed our Fire Station in Straubenhardt which is being built in the spirit of cradle-to-cradle. In an interview, Ingmar Menzer presents our project and the cradle-to-cradle founder Michael Braungart talks about sustainability.

to the radio program
(starting at 10'50)