General Restoration Swimming Pool and Sports Hall School Center Fürstenried-West, Munich

The existing building of the school center Fürstenried-West was built in 1974 and is located in the city district Fürstenried. Our task is the general overhaul of the sports hall and swimming pool. The building is a free-standing building with an almost square ground plan (54.6 m x 52.8 m).

more

Our aim is to reinterpret the architectural language of the 1970s into a clear, contemporary and outwardly opening architectural language. Generous proportions and the elaboration of the exciting interplay of the cubes ensure the special quality of this redevelopment.

The ground floor comprises a three-field hall with adjoining rooms, the basement a swimming pool and a further one-field sports hall with adjoining rooms. On the upper floor, above the adjoining rooms of the sports hall, are two caretaker apartments. The sports area is used by the two affiliated schools, the Joseph von Fraunhofer Realschule and the Gymnasium Fürstenried. In addition, the sports area as well as the pool, are used intensely by sports clubs.

less

Competition with subsequent VOF procedure
07 2010

Start of planning
10 2012

Completion
07 2022

Client
Landeshauptstadt München, Referat für Bildung und Sport,
Projektleitung: Landeshauptstadt München, Baureferat - Hochbau

Location
Graubündener Straße 50, 81475 München

more

Construction cosots
approx. 23,3 Mio. EUR

Service phases
2-5

Planning team
Coskun Kocak (TL), Pawel Adamczyk, Kim Keumok, Ana Alanis Rodriguez, Hilal Yilmaz, Jingjia Zhang

Construction management
G+O Architekten GmbH, Geretsried

Strctural engineering
m4 Ingenieure GmbH, München

Building physics
Möhler + Partner Ingenieure AG, München

Landscape design
Wankner und Fischer, Eching/Günzenhausen

Photos
© Markus Guhl for wulf architekten

less